York Driveways

How a York driveway are built

Last updated

A drive is only as good as what's underneath it. This guide walks through each stage of a new driveway, what happens on site and what to expect, so you know what you're paying for.

No-obligation quote

Thinking about a new drive?

  • Drainage designed for York's wet winters
  • Conservation area points raised early
  • Ring road suburbs and outlying villages
Request a quote

1. The visit and survey

Ask the professionals who quote to start with a visit. Ask them to measure the area, look at how the plot slopes, find manholes, gullies and service covers, and note anything that will need care, such as a tree close to the drive, a low damp-proof course or a boundary wall. Ask how the drive will be used: how many cars, whether a van or caravan will park there, and whether anyone needs level access to the door.

If the house is in one of York's conservation areas, or close to a listed building, we raise it at this stage so you can check with City of York Council before any walls or railings come down.

2. The test hole

York's ground changes from street to street. Lake clays and glacial till drain slowly; the sands and gravels around places like Nether Poppleton and Strensall drain quickly. Ask about digging a test hole to see what's there, how firm it is and how fast water soaks away. That decides how deep the base needs to be and whether a soakaway will work.

Example image: Edwardian house in Fulford, York, with a gravel drive and clay edging

3. The kerb

If the pavement kerb isn't already dropped across the full width you need, the crossing has to be approved by City of York Council and built to its standards. Approval can take some weeks, and the council's decision can affect where the drive meets the road, so when you get quotes, ask the professionals who quote to suggest applying before the rest of the work is booked. Our dropped kerbs page explains the process.

4. Fixed quote

After a visit and test hole, ask the professionals who quote to send a fixed quote. It sets out the area, what's being removed, the depth of base, the drainage, the edging and the surface, so you can compare it properly with any other quote.

5. Breaking out and digging down

On the first day, ask the professionals who quote to protect paths, walls and the house, then break out the old surface and dig out soil to the agreed depth. Most drives need a dig of 150 to 250 millimetres, more on soft clay or where vans will park. Spoil goes off site in a licensed skip or grab lorry. Ask for air bricks and the damp-proof course to be kept clear, because the finished drive must sit at least 150 millimetres below the damp-proof course.

6. The sub-base

The sub-base is the layer that carries the load. Crushed stone in layers and compact each one with a plate or roller. For a permeable drive, ask about open-graded stone with no fines, so water can pass through and be held while it soaks away. For standard block paving or tarmac, ask about a dense, well-graded stone that locks together. On weak ground, ask whether a geotextile membrane is needed to stop the stone sinking into the clay.

Example image: semi in Osbaldwick, York, with a tarmac drive and block-paved edging

7. Drainage

Every front drive needs somewhere for the rain to go. Depending on the surface and the ground, that can be:

  • straight through a permeable surface into the sub-base and the ground below,
  • a fall to a lawn or border on your own land,
  • a channel drain across the drive, connected to a soakaway,
  • a soakaway filled with stone or crates, where the ground drains well enough.

Running water onto the road isn't allowed for new impermeable front drives over five square metres without planning permission, so ask about the drainage to keep it on your plot.

8. Edging

Edges stop the surface spreading and keep the base in place. For block paving ask about setting edge courses in concrete; for resin and tarmac and using kerbs, blocks or steel edging; for gravel a firm edge and a paved threshold at the pavement stop stones escaping. This is also when to ask about any steps or ramps.

9. The surface

  • Block paving: a bedding layer of sharp sand or grit, the blocks laid to pattern, cut to the edges, compacted and jointed.
  • Resin-bound: a porous base, then the resin and aggregate mixed on site and trowelled smooth. It needs dry weather and time to cure.
  • Tarmac: a base course and a surface course, laid hot and rolled.
  • Gravel: a stabilising grid on the sub-base, filled and topped with decorative stone.

Our pages on block paving, resin-bound, gravel and tarmac go into each in more detail.

Example image: permeable paving in a small front garden on a Victorian terrace

10. Handover

Ask about clearing the site, checking the falls with water where possible, and talking you through looking after the new surface. Resin-bound needs time before cars use it, and new tarmac is best treated gently in its first hot spell. Ask about when the drive is ready to use.

How long it takes

A typical single or double drive takes several days on site, longer for large drives, difficult access, extra drainage or bad weather. Resin needs dry conditions, so it's the surface most likely to move with the forecast. The kerb, if it needs council approval, often sets the overall timetable.

No-obligation quote

Request a quote

Use the form to tell us what you have in mind and where you live. It is worth asking the professionals who quote to discuss it and provide a quote.

  1. Fill in the form. Your idea and postcode.
  2. Get quotes from local professionals.
  3. Quote. No charge, no commitment.

We only use your details to respond to your enquiry. Read our Contact · privacy policy.

Let's talk about your driveway

New driveways for homes across York and its villages.

Enquire